$100,000 structure fire at Murray Bridge Panel Shop - 11 November 2022
CFS and MFS crews were called to a structure fire at Murray Bridge Panel Shop on Old Princess Highway at 4:50 am.
6 trucks from both CFS and MFS Murray Bridge have contained the fire to a quarter of the panel shop. No one was in the shop when fire started and no injuries have been obtained.
Hazmat crews are currently responding due to chemical spill within shed.
Losses are estimated at $100,000 and fire cause investigators have been contacted.
2022-11-11 Rachel Guy